Workbench flat lay with hand tools, wood plank, and screws mid-project
Features

Everything your next project needs.

One app for inventory, planning, and building -- so you spend less time managing and more time making.

auto_awesome
AI Project Generator
Turn the wood you've got lying around into your next project in seconds. Pick your materials, get a complete build plan -- steps, cut list, difficulty, time estimate -- generated instantly.
Example project
Example: describe a project you want to build, and WouldBuild's AI generates a full build plan, including a real concept render like the one shown -- matched to your own inventory -- in seconds.
auto_fix_high
Concept Board + Hybrid Regeneration
Collect reference ideas, photos, and quick notes onto any saved plan, then regenerate it as a real Hybrid design that actually blends them in -- not just a note attached to the side. Keeps your original plan untouched and links the new build straight back to it.
Step 1 of 3: a real Idea captured in WouldBuild --
inventory_2
Inventory Manager
Stop buying what you already own. Every board, bolt, and tool tracked with photos, stock levels, and a board-foot calculator built in -- know what you have before you shop.
qr_code_scanner
Mobile Scanner
Find anything you own in one scan. Point your phone at a QR label to pull up any item instantly, or quick-add hardware counts right from the aisle.
A real printable QR label sheet generated from a WouldBuild inventory
straighten
Cut Optimizer
Waste less wood, spend less money. Our optimizer automatically arranges every cut across your available boards for maximum yield, with a visual diagram so you know exactly where to cut.
A real Cut Optimizer layout -- a color-coded legend and board diagram showing how parts are arranged to minimize waste
3d_rotation
3DWright Model Library
Your whole 3D printing workflow, in one place. Upload and manage your own STL/GCODE files, then send any print job straight to your connected OctoPrint instance -- no juggling apps.
filter_vintage
Filament Inventory
Never run out mid-print again. Every spool tracked by brand, material, color, and grams remaining -- log a print and we auto-parse the grams used straight from your sliced file.
view_in_ar
3D Print Discovery
Missing a part? Print it instead of buying it. We match your build's needs against a library of printable models, so the piece you don't have becomes the piece you make.
Real filament spools tracked in WouldBuild -- brand, color, and remaining grams at a glance
photo_camera
Reverse Engineer
Found something you want to build online or in a photo? Upload it and let AI reverse-engineer a full build plan -- steps, cut list, materials -- from the image alone, no description needed.
checklist
Smart Shopping List
Never make an extra trip to the store. Your shopping list builds itself from what's low or out, grouped by supplier with reorder links ready to go -- just check off as you shop.
palette
Finishing Schedule Wizard
Never guess your finishing schedule again. Get a species-aware plan -- sanding grits, stain, grain filler, topcoat, and dry times -- so your finish looks as good as your build.
folder_open
Project Plans & History
Every build you dream up or finish, saved forever. Wish-list plans you want to try, a photo history of what you've built, and instant replay on any past project.
public
Community Gallery
Get inspired, get credit. Share your finished builds, browse what the community is making, and load any shared plan straight into your own generator to make it your own.
sync
Synced Everywhere
Your stuff, everywhere you are. Sign in once and your inventory and projects sync automatically across every device -- and keep working even when you're offline.
lightbulb
Ideas
Never lose a good idea again. Jot it down the second it hits you -- searchable, archivable, with an optional reference photo -- kept separate from your active builds until you're ready.
vpn_key
BYOK: Bring Your Own Key
Paste your own Anthropic or OpenRouter key and run the project generator on your own account, with no monthly cap -- ever.
Get Started Free